基面处理:把基面处理干净、并应平整结实、无空鼓,孔隙、砂眼须用水泥砂浆填补平整。如气温较高或基面较干燥,施工前应用清水充分湿润至无明水为准。
Clear up the base, and it should be smoothly, also must check whether empty drum or not, then filled up the gap and sand hole with cement mortars. Fill up smoothly, if it was high temperature or dry surface, it would moisten the surface with water before the construction.
搅拌方法:将液料倒入干净的搅拌桶内,然后按比例边搅拌边慢慢倒入粉料,充分搅拌至均匀无粉粒,无沉淀的膏糊状,静置几分钟后再稍稍搅拌即可使用(建议能用电动搅拌器搅拌效果更佳)。
Pour the liquid materials in achurn, then pour the powder slowly in proportion, fully stirred and combine until it just incorporated, it can be used after a few minutes standing and stir briefly(it is better to use electric mixer).
涂刷: 用毛刷或滚筒直接滚刷于处理好的基面,不可漏刷。涂刷时如有气孔,应反复涂刷将气体排出,涂刷完第一遍,待其表干(表面不粘手)后,再依次交错涂刷第二遍,如此反复至少两至三遍,每遍的厚度不超出0.8mm,以免影响施工效果。
Making the surface good first, then brush the surface with hairbrush or roller brush, don't forget to brush inextenso. If there is some air holes, please brush it again and again until there isn't any air holes. Then brush the surface second time when you finished the first time and lay it for a few minutes (when the coating isn't sticky). Such repeated twice or three times, and the thickness was less than 0.8mm ,lest affect the construction effect.
养护:防水施工24小时后喷细雾水养护,至少48小时后进行闭水试验(温度较低或通风不良时,可适当延迟进行)。
Sprinkle some water on the surface to maintenance after 24 hours. Make the closed water test at least 48 hours later (hold the matter over till the right conditions if temperature is low or ventilation is poor).
。